OWNER INFORMATION
Owner Name Report ID# B1128303170482V55
Address 6145 175TH ST W FARMINGTON, MN 55024 Date Processed Jul 31, 2007
PROPERTY CHARACTERISTICS      
Living Area : 2114Sq.ft Year Built 1993
Stories: 1 Fireplaces:
Bedrooms: 4 Air Condition : False
Bathrooms: 2 Pool: False
ESTIMATED REPLACEMENT COST RANGE  LOW  HIGH
Estimated Replacement Cost Range:   238,419 291,401
PROPERTY DETAILS  LOW  HIGH
Structure Components:  0 0
Base Cost: 92,672 113,266
Climate Control: 6,691 8,177
Parking: 6,771 8,275
Plumbing: 7,253 8,865
This value is based on the information we have for standard construction in your area which includes wood frame construction, insulation, rough plumbing, electrical, doors & windows, heating, air conditioning, ductwork and attached covered spaces such as garage and patios.
Foundation: 23,369 28,563
This value is based on the general support of the structure including basements and porches. Types of foundations include concrete slab, raised foundation and stem wall.
Roofing: 7,093 8,669
Exterior Finishes:  11,607 14,187
This value is based on construction from the frame of the structure outwards including detached garages. Exterior finishes are comprised of materials such as stucco, vinyl, aluminum and wood. Roofing materials include wood shake, asphalt shingle, concrete tile and clay tile to name a few.  
Interior Finishes:  0 0
Built-in Appliance 5,814 7,106
Bathroom 7,132 8,716
Flooring 10,899 13,321
Kitchen 11,435 13,976
Walls and Ceilings 0 0
This value is based on the interior finish work in your area consisting of floor coverings including carpet, tile, hardwood and laminates, grade of cabinetry and countertops, built-in appliances, walls taped textured and painted, etc..  
Additional Costs:  155,388 189,919
Profit: 19,074 23,312
OverHead: 19,074 23,312
Debris removal: 9,536 11,656
Architect Fee: 0 0
This value is based on general construction costs associated with building a structure including permits, site work, profit and overhead, architect fees and debris removal, etc..  
DISCLAIMER

The Estimated Replacement Cost (ERC) value is based on various mathematical formulas and techniques proprietary to Bluebook International. This report has not been prepared by a licensed appraiser nor does it constitute an official appraisal of the structure. The ERC is not a market valuation tool, and does not provide a current market analysis for a specific property. It does not account for considerations such as condition, complexity of structure, inaccurate data, obsolescence or unknown improvements or detriments to the property. The information in this report is provided “as is” and all uses are at the user’s sole risk. Bluebook International is not liable for the accuracy of the information provided in this report.